EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Greg's_RV-10
-
Listing for Category : 44: wing attach
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (464)
General
- (42)
-
Loose Ends
-
Spar fix - left side...
-
Fixing spar issue
-
Finish kit update
-
Engine Options
-
Serial Numbers
-
May have messed up...
-
Moving forward
-
Stalled out a little
-
Bad news from Vans
-
Running list of kit...
-
Laser Cut Parts Update
-
Airventure 2023 /...
-
Laser cut parts
-
Oshkosh countdown
-
Finish Kit Ordered
-
Fuselage inventory
-
Fuselage arrives /...
-
Airplanes and Coffee...
-
Fuselage Shipped
-
Tech Counselor Visit
-
New Primer
-
Airventure 2022
-
Wing inventory
-
Wing shipped
-
Fuselage Ordered
-
Moving day
-
RV-10 visit
-
My other airplane...
-
Wing Kit Ordered
-
GMP visit with EAA...
-
Empennage Inventory
-
Primer test #2
-
Empennage shipped!...
-
It's Official -...
-
Empennage Ordered!
-
N-number reserved
-
She said yes...well,...
-
Funding the Project
-
RV-10 vs. RV-14
-
Time to get serious
Research/Train
- (7)
Workshop & Tools
- (11)
Practice Kit
- (8)
6: Vertical Stab
- (11)
7: Rudder
- (11)
8: Horiz Stab
- (23)
9: Elevators
- (46)
10: Tail Cone
- (28)
11: Emp Attach
- (8)
12: Fairings
- (19)
13: Main spar
- (7)
-
13-3 thru 13-5: Left...
-
13-2 thru 13-4: Left...
-
13-4 & 13-5:...
-
13-3: Right spar...
-
13-2 & 13-3:...
-
13-2 & 13-4:...
14: Wing Ribs
- (7)
-
14-5 & 14-6:...
-
14-3: Right ribs primed
-
14-2: Right wing rib...
-
14-3 thru 14-5: Left...
-
14-2 & 14-3:...
-
14-4: Conduit planning
-
14-2: Wing rib prep
15: Rear Spar
- (6)
-
15-3 & 15-5:...
-
15-2 thru 15-3 &...
-
15-5: Right rear spar
-
15-4: Right rear...
-
15-4: Left rear spar...
-
15-2 thru 15-4: Left...
16: Top Skins
- (7)
-
16-3: Right top skin...
-
16-2: Right skin...
-
16-3: Left top skin...
-
16-2: Left and right...
-
16-2: Right top skin...
-
16-2: Prep, prime...
-
16-2: Top skin prep
17: Outboard LE
- (10)
-
17-4: Attaching...
-
17-3: Right LE riveting
-
17-3: Finish left LE
-
17-3: Start riveting...
-
17-3: Dimpling...
-
17-3: Misc work and...
-
17-3: Fit up leading...
-
17-2; Prep leading...
-
17-2: Starting...
-
17-2: Leading edge...
18: Fuel Tank
- (24)
-
18-8: Right tank...
-
18-8: Left tank done
-
Fuel tank repair 3
-
Fuel tank repair 2
-
Fuel tank repair 1
-
Tank leak found
-
18-8: Right tank...
-
18-8: Sealing up...
-
Water leak check and...
-
18-5 thru 18-7: Last...
-
18-5: Left tank work
-
Fuel Return - AN...
-
18-5: Back at the...
-
18-2: More left fuel...
-
18-2: Starting left...
-
18-7: Rt tank fuel...
-
18-5 & 18-6:...
-
18-5: Right tank...
-
18-5: Right tank...
-
18-5: Right tank...
-
18-4: Final prep for...
-
18-4 & 18-5:...
-
18-2 & 18-3:...
19: Omitted
20: Bottom Skins
- (10)
-
20-5 & 20-6:...
-
20-5: Right bottom...
-
20-5 & 20-6:...
-
20-5: Back to the...
-
20-5: Right bottom...
-
OP-38: Aileron trim...
-
20-5: Left bottom...
-
20-5: Bottom skin work
-
20-4: Flap gap fairings
-
20-4: Flap gap fairings
21: Aileron
- (8)
-
21-9: Right Aileron...
-
21-9 & 21-10:...
-
21-5 thru 21-9:...
-
21-8: Left aileron...
-
21-6 thru 21-7: Left...
-
21-5: Aileron prime...
-
21-2 to 21-5:...
-
21-2 thru 21-5:...
22: Flap
- (7)
-
Right flap twist
-
Right flap work
-
22-8: Left flap...
-
22-6 thru 22-8: Back...
-
22-6: Left flap...
-
22-5: Left flap...
-
22-2 - 22-4:...
23: Aileron Actu
- (3)
-
23-8 & 23-9:...
-
23-8 & 23-9:...
-
23-2 thru 23-6:...
24: Wing Tip
- (9)
-
24-6: Tips done
-
A little more tip work
-
24-3: Finishing up...
-
Finish up tip lenses
-
24-3: Back on the...
-
24-2 & 3: Right...
-
24-3: More right tip...
-
24-2: Tips progress
-
24-2: Starting on...
25: Mid Fuse
- (4)
-
25-6: Priming and...
-
25-4 thru 6: Center...
-
25-2,3 & 5:...
-
25-2: SB-007
26: Fuse Ribs
- (7)
-
26-7: Riveting...
-
25-7: Priming and...
-
26-5 & 25-6:...
-
26-5 thru 26-7: Lots...
-
26-2 thru 4: Prime...
-
26-2: Starting fuse...
27: Firewall
- (4)
-
FF2: Oil cooler bracket
-
27-3 thru 27-5:...
-
27-2: Riveting firewall
-
27-2: Starting firewall
28: Fwd Fuse
- (8)
-
Tunnel access panel...
-
Tunnel access panel
-
28-14 & 15: Fwd...
-
28-13 & 14:...
-
28-9 thru 28-11:...
-
28-11: Forward fuse...
-
28-4 thru 28-10:...
-
28-2: Starting on...
29: Fuse Skins
- (20)
-
29-17, 18, & 23:...
-
29-18: Right front...
-
29-21 & 22 Left...
-
29-21: Left side...
-
29-18, 20 & 22:...
-
29-21: Right landing...
-
29-18: Back at the...
-
29: Wing root priming
-
29-18: Right side...
-
29-18: Left side skins
-
29-17: Side skin...
-
29-16: Longeron and...
-
29-16 & 29-18:...
-
29-15: Priming and...
-
29-14: Rework
-
29-13: Deburring and...
-
29-12 thru 14: Fwd...
-
29-9: Longeron...
-
29-2 thru 29-7 &...
-
29-3: Side skin...
30: Step
- (3)
-
30-4: Redrill left step
-
30-2: thru 30-4:...
-
30-2: Right side step
31: Upper Fuse
- (4)
-
Replace fwd fuse rib
-
31Q-2, 5, 7 & 8:...
-
31Q-2 & 4 thru...
-
31: Just messing around
32: Tail Attach
- (3)
-
32-5: Finishing up...
-
32-2 thru 5: Final...
-
32-2: retrieve tail...
33: Baggage Area
- (10)
-
33-8 thru 33-10:...
-
33-8: Rear bulkhead
-
33-5 thru 33-8:...
-
AC/Baggage area work
-
33-4: Baggage floor...
-
33-4: Redo baggage...
-
33-2 thru 33-5:...
-
Baggage Floor Conduits
-
33-4: Baggage floor...
-
Step access panels
34: Baggage Door
35: Access Panel
- (3)
-
35-2: Back to the...
-
35-2: Rear floor pan...
-
35-6: Tunnel covers
36: Brake Lines
- (2)
-
36-3 thru 36-4:...
-
32-2: Starting on...
37: Fuel System
- (2)
-
Andair fuel valve
-
37-3: Starting fuel...
38: Rud Pedals
- (4)
-
Forward rudder pedal...
-
38-6 & 7: TS...
-
38-8 thru 38-10:...
-
38-2 thru 38-5:...
39: Control Sys
- (1)
-
39-2 thru 39-10:...
40: Flap Sys
- (4)
-
Flap wiring
-
40-5 thru 40-8:...
-
40-4 thru 40-8: Flap...
-
40-2 thru 40-4 &...
41: Up Fwd Fuse
- (4)
-
41-4: Avionics fan...
-
41-4: Back to the plans
-
Panel work
-
41-2 thru 41-3:...
42: Rear Seat Bk
- (2)
-
42-2 thru 42-4:...
-
42-2 thru 44-3: Left...
43: Cabin Cover
- (2)
-
43:2: Cabin fitting
-
43-3: Started...
44: Wing Attach
45: Cabin Doors
46: Engine Mount
47: Spin & Cowl
48: Wheel Fair
49: Seats
50: Cabin Vent
Avionics
- (44)
-
Panel punch list
-
Harness finishing...
-
Harness done for now
-
Rear terminal strip
-
Panel wiring -...
-
Still working the panel
-
Panel progress
-
Wire harness 90% done
-
Wiring harness progress
-
Wiring harness progress
-
Wiring harness
-
Transponder rack
-
More rear power panel
-
LRU placement
-
Rear power panel
-
Panel mock-up
-
Electrical/Avionics...
-
Relocating COM antenna
-
Transponder Antenna...
-
Antenna planning
-
COM1 antenna
-
Pitot tube and OAT
-
Adjust coax conduit
-
Back on the wing wiring
-
Wing wiring - Left...
-
Pitot Mast
-
Pitot heat controller
-
Wing wiring
-
Pitot mast and Heater
-
Wing tip wiring
-
OP-38: Aileron trim
-
More wing wiring
-
Connectors / OAT Probe
-
Starting on wing wiring
-
First big Steinair...
-
Research - CANBUS...
-
More electrical design
-
Preliminary Panel...
-
Continuing Panel...
-
More Avionics...
-
Avionics/Electrical...
-
Yaw damper mount
-
Static plumbing and...
Air Conditioner
- (11)
-
Evaporator drain hose
-
AC Punch list
-
AC Hoses
-
Evaporator mounting
-
AC progress
-
AC: Tunnel hose...
-
AC - Condenser scoop
-
AC - More hose Routing
-
AC - baggage area work
-
Air conditioner arrived
-
Air Conditioner...
Lighting
- (8)
-
Landing light install
-
Flyled Landing lights
-
Duckworks done for now
-
Duckworks -...
-
Ductwork's redo
-
Duckworks - painting...
-
Duckworks LE cuts...
-
Duckworks landing...
Interior Finish
- (1)
-
Aerosport Options
Inspection
Painting
- (1)
-
Starting to think...
Builder Name:
Greg Kochersperger
-
Project:
Vans - RV-10
Total Hours:
1327.9
Total Flight Time:
1.1
Start/Last Date:
Jan 15, 2021 - No Finish Date
Engine:
IO-540
Propeller:
TBD
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=Greg's_RV-10
Home or Last Project Picture
No Entries found
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.